Local News

Second phase of infrastructure improvements addresses long-running challenges in southeast Fort Wayne

FORT WAYNE, Ind. (WOWO): City officials cut the ribbon on Phase-Two of a storm water and sidewalk project in southeast Fort Wayne on Monday.

The 3.7 million dollar project saw drainage upgrades to alleviate a long running problem with standing water on Hessen Cassel Road. New sidewalks were also installed to make walking safer for residents who previously had to use the edge of the road.

Related posts

Electric Works 5th extension of deadlines facing opposition from local elected officials

Brian Ford

Pence, Biden head to dueling rallies in fierce Indiana race

AP News

Buttigieg says he will stop accepting lobbyist contributions

AP News

Leave a Comment