Local News

Resurfacing to Begin Monday

FORT WAYNE, Ind. (WOWO): Starting Monday, there'll be a little more congestion on our roadways. The Street Department just released their resurfacing schedule. Because of the roadwork, watch for slowdowns on Crescent Avenue, Clinton Street, and State Boulevard. The city says drivers should look for alternative routes, because delays are expected.

 

Resurfacing schedule:

 

7-29-13        Crescent Ave. – Columbia Ave. to State Blvd.

7-30-13        Clinton St. – Lima Rd. to Coldwater Rd.

7-30-13        State Blvd. – Tyler Ave to Pointsette Dr.

Related posts

Monday stabbing victim identified

Derek Decker

Fort Wayne police make drug bust after traffic stop

Darrin Wright

Democrats’ Old, New Guard Clash Over US Senate Race in Ohio

Kylie Havens