Local News

Resurfacing to Begin Monday

FORT WAYNE, Ind. (WOWO): Starting Monday, there'll be a little more congestion on our roadways. The Street Department just released their resurfacing schedule. Because of the roadwork, watch for slowdowns on Crescent Avenue, Clinton Street, and State Boulevard. The city says drivers should look for alternative routes, because delays are expected.

 

Resurfacing schedule:

 

7-29-13        Crescent Ave. – Columbia Ave. to State Blvd.

7-30-13        Clinton St. – Lima Rd. to Coldwater Rd.

7-30-13        State Blvd. – Tyler Ave to Pointsette Dr.

Related posts

Massachusetts Powerball ticket wins $758.7 million

Brooklyne Beatty

Indiana reports 21 more COVID-19 related deaths

Heather Starr

Mother arrested in connection to Jay County boy’s death

Caleb Hatch