Local News

Paving Operations Today and Friday on US 27/Lima Road

FORT WAYNE, Ind. (WOWO): The Indiana Department of Transportation (INDOT) Fort Wayne District announces that motorists can expect to see paving operations on the southbound lanes of US 27/ Lima Road between SR 930 (Coliseum Boulevard) and Dalgren Avenue. The work is anticipated to occur throughout the day today and Friday as the contractor will be paving asphalt on the mainline of the southbound lanes.

All traffic restrictions will remain in place. Motorists should watch for additional construction traffic and temporary restrictions to the west side of the roadway while the asphalt is installed.  All work is weather dependent and may continue into Saturday.

Related posts

Fort Wayne among Community Crossing grant recipients

Darrin Wright

Memorial Day Weekend ceremonies include unveiling and dedicating Vietnam Memorial replica in Allen County

Brian Ford

Tri-State residents urged to prepare for dangerous heat wave, Red Cross says

Brian Ford