Indiana NewsLocal News

Delayed pedestrian bridge to open this summer

(Photo Supplied/Ivy Tech Community College)

FORT WAYNE, Ind. (WOWO): A long-delayed pedestrian bridge that connects two Fort Wayne college campuses will open this summer.

The Parker-Cole Crossing Bridge can be seen on Coliseum Blvd., east of the intersection with North Anthony Blvd., connecting the campuses of Purdue Fort Wayne and Ivy Tech Community College.

It was supposed to open in August 2018, but the Journal Gazette reports that was put off after engineers noticed some inconsistent testing results.

Since then, a pier has been added to stabilize the bridge, and all that’s left to do is wrap up some painting and install some lighting, with mid-summer opening in mind.

Related posts

Governor Mike Pence’s 2015 State of the State Address

Kayla Blakeslee

Etna Green Man Injured in ATV Crash

Kylie Havens

Potential Floodwaters Poise Health Concern

Dean Jackson

Leave a Comment