Local News

Capital Improvement Board chooses firm to develop downtown arena plans

(Photo supplied/Greater Fort Wayne Inc.)

FORT WAYNE, Ind. (WOWO): The Fort Wayne Capital Improvement Board has chosen a firm to provide preliminary design and cost estimates for a proposed downtown arena and event center.

The CIB today approved a $283,000 contract with Sink Combs Dethlefs for architectural and engineering services.

That firm will partner with Elevatus Architecture, Design Collaborative and Hoch Associates to develop plans by December, which will then be used to determine whether or not the proposed arena becomes a reality.

The CIB met with Sink Combs Dethlefs and two other finalists for the job before making their choice, touting the firm’s “long-standing reputation and track record” in arena and event center design.

Related posts

Investigation in Huntington nets one arrest, police believe suspect could have more stolen items

Kayla Blakeslee

Albion Crash Sends Two to Fort Wayne Hospital

WOWO News

Two injured in Southside Collision

Dean Jackson

Leave a Comment