Local News

Resurfacing to Begin Monday

FORT WAYNE, Ind. (WOWO): Starting Monday, there'll be a little more congestion on our roadways. The Street Department just released their resurfacing schedule. Because of the roadwork, watch for slowdowns on Crescent Avenue, Clinton Street, and State Boulevard. The city says drivers should look for alternative routes, because delays are expected.

 

Resurfacing schedule:

 

7-29-13        Crescent Ave. – Columbia Ave. to State Blvd.

7-30-13        Clinton St. – Lima Rd. to Coldwater Rd.

7-30-13        State Blvd. – Tyler Ave to Pointsette Dr.

Related posts

Fort Wayne distillery now making hand sanitizer

Darrin Wright

Fort Wayne weekend events, September 7 – 9

Brooklyne Beatty

Police Serve Warrants at Fort Wayne Business, Residence

WOWO News