Local News

Resurfacing to Begin Monday

FORT WAYNE, Ind. (WOWO): Starting Monday, there'll be a little more congestion on our roadways. The Street Department just released their resurfacing schedule. Because of the roadwork, watch for slowdowns on Crescent Avenue, Clinton Street, and State Boulevard. The city says drivers should look for alternative routes, because delays are expected.

 

Resurfacing schedule:

 

7-29-13        Crescent Ave. – Columbia Ave. to State Blvd.

7-30-13        Clinton St. – Lima Rd. to Coldwater Rd.

7-30-13        State Blvd. – Tyler Ave to Pointsette Dr.

Related posts

Fort Wayne Teenager In The Allen County Jail On Felony Charges

David Scheie

Allen County Coroner’s Office Id’s 3 men shot to death in bar

Saige Driver

Police arrest suspect in connection to Friday’s shooting

Heather Starr