Local News

Resurfacing to Begin Monday

FORT WAYNE, Ind. (WOWO): Starting Monday, there'll be a little more congestion on our roadways. The Street Department just released their resurfacing schedule. Because of the roadwork, watch for slowdowns on Crescent Avenue, Clinton Street, and State Boulevard. The city says drivers should look for alternative routes, because delays are expected.

 

Resurfacing schedule:

 

7-29-13        Crescent Ave. – Columbia Ave. to State Blvd.

7-30-13        Clinton St. – Lima Rd. to Coldwater Rd.

7-30-13        State Blvd. – Tyler Ave to Pointsette Dr.

Related posts

Fantasy of Lights to return on Nov. 13

Caleb Hatch

American Red Cross Campaign to Help Residents on Southeast Side with Fire Safety

Kylie Havens

Waterloo Man Executed in Ohio Prison

WOWO News